Skip to content
on NiftyScanner

Find your next idea

A bond portfolio faces a parallel yield rise

Series IV practice case · 4 questions · 1 mark each

Change set

Question 1 of 4Case practice

0 right · 0 wrong · 4 to go

The case · stays here for all 4 questions

A treasury desk owns a bond portfolio worth ₹1,00,00,000. Its modified duration is 4.5. The desk uses the first-order approximation percentage price change = −modified duration × yield change, with yield change written as a decimal. It considers a parallel rise in yields of 0.50 percentage points. A selected bond futures contract has a price value of one basis point, or PVBP, of ₹150 per contract. A long futures position loses about ₹150 when yields rise by one basis point, while a short position gains that amount. Ignore convexity, basis changes, transaction costs and changes in the hedge ratio.

The portfolio duration and contract PVBP are given assumptions.

Results are first-order estimates, not exact price forecasts.

Case 1 · Q1 of 41 markIV-P-C01-Q1

What is the estimated percentage change in the bond portfolio value?

Learn these topics

The written-out answers on this page are hidden while your timed set runs.

The case and its answers

Every question of this case, with its answer and why each other option is wrong.

A treasury desk owns a bond portfolio worth ₹1,00,00,000. Its modified duration is 4.5. The desk uses the first-order approximation percentage price change = −modified duration × yield change, with yield change written as a decimal. It considers a parallel rise in yields of 0.50 percentage points. A selected bond futures contract has a price value of one basis point, or PVBP, of ₹150 per contract. A long futures position loses about ₹150 when yields rise by one basis point, while a short position gains that amount. Ignore convexity, basis changes, transaction costs and changes in the hedge ratio.

The portfolio duration and contract PVBP are given assumptions.

Results are first-order estimates, not exact price forecasts.

  1. Q1What is the estimated percentage change in the bond portfolio value?
    • Option A. −2.25% — Correct answer

    • Option B. −0.225%

      Why it is wrong: This understates the yield shock by a factor of ten.

    • Option C. −225%

      Why it is wrong: This treats 0.50 percentage points as a decimal of 0.50 instead of 0.005.

    • Option D. +2.25%

      Why it is wrong: A conventional fixed-rate bond portfolio falls in price when yields rise.

    Answer: A. Estimated price change = −4.5 × 0.005 × 100 = −2.25%. The negative sign is essential. Remember: Distinguish percentage points from decimal yield changes.

    Hint, shown before you answer in practice mode: Convert the yield move to 0.005 before multiplying.

    IV-P-C01-Q1mediumnumerical

    Study this unit

  2. Q2What is the estimated loss in rupees before hedging?
    • Option A. ₹22,500

      Why it is wrong: This is only 0.225% of portfolio value.

    • Option B. ₹2,25,000 — Correct answer

    • Option C. ₹2,250

      Why it is wrong: This omits two zeros when applying the percentage to the portfolio.

    • Option D. ₹4,50,000

      Why it is wrong: This corresponds to a one-percentage-point yield rise.

    Answer: B. Estimated loss = ₹1,00,00,000 × 4.5 × 0.005 = ₹2,25,000. Convexity is deliberately excluded. Remember: A duration percentage must be applied to market value.

    Hint, shown before you answer in practice mode: Multiply the portfolio value by 2.25%.

    IV-P-C01-Q2mediumnumerical

    Study this unit

  3. Q3What is the portfolio PVBP under the same approximation?
    • Option A. ₹150

      Why it is wrong: This is the futures contract PVBP, not the portfolio PVBP.

    • Option B. ₹450

      Why it is wrong: This understates exposure by ten times.

    • Option C. ₹45,000

      Why it is wrong: This overstates exposure by ten times.

    • Option D. ₹4,500 per basis point — Correct answer

    Answer: D. Portfolio PVBP = ₹1,00,00,000 × 4.5 × 0.0001 = ₹4,500. It is the approximate price sensitivity to a one-basis-point yield move. Remember: Match portfolio and hedge sensitivities in the same units.

    Hint, shown before you answer in practice mode: One basis point is 0.0001 in decimal yield.

    IV-P-C01-Q3mediumnumerical

    Study this unit

  4. Q4Which futures hedge approximately offsets this portfolio PVBP?
    • Option A. Sell 3 futures contracts

      Why it is wrong: Three contracts cover only ₹450 per basis point.

    • Option B. Buy 30 futures contracts

      Why it is wrong: A long position loses when yields rise, adding to the portfolio loss.

    • Option C. Sell 30 futures contracts — Correct answer

    • Option D. Sell 300 futures contracts

      Why it is wrong: This would hedge ten times the portfolio PVBP.

    Answer: C. Required contracts = 4,500 ÷ 150 = 30. A short futures position gains when yields rise, offsetting the portfolio’s approximate loss. Remember: A hedge needs both the right size and the right direction.

    Hint, shown before you answer in practice mode: Divide ₹4,500 by ₹150 and choose the offsetting direction.

    IV-P-C01-Q4hardnumerical

    Study this unit

Back to the cases

All Series IV cases

Every Series IV case and case set.

All Series IV cases

Paper Trading Try it on the practice trading desk